Remaining Works of Sohar Sewerage Network Phase III

Location
Sohar, Al Batinah North.
Client:NAMA
Main Contractor:Gulf Petrochemical Services
Activity:Sewer Network Construction and Pipe jacking

Zakka Trading and Construction is currently executing sewer network works involving excavation and trenchless pipe jacking operations for various pipeline diameters. The scope of work includes open-cut excavation, shaft construction,
and pipe jacking for casing diameters ranging from 800 mm to 1600 mm. The construction of a sewer network pipeline excavation, beginning with the identification and mapping of underground utilities to ensure safe excavation.
Excavation works are carried out with proper pit preparation, incorporating benching or slope cutting techniques to provide trench protection and maintain stability. Once the trench is prepared, sewer pipelines are laid to the specified
alignment and gradient, followed by jointing and inspection to confirm integrity. After installation, the trenches are backfilled with suitable material in compacted layers to restore ground conditions and ensure long-term durability of the sewer system. The project is being carried out using experienced technical manpower and
specialized machinery, ensuring safe execution, precise alignment, and minimal disturbance to surrounding infrastructure. All activities are performed in compliance with approved drawings, safety standards, and quality requirements to ensure efficient and reliable completion of the sewer network system.

Remaining Works of Sohar Sewerage Network Phase III - Image 1
Remaining Works of Sohar Sewerage Network Phase III - Image 2
Remaining Works of Sohar Sewerage Network Phase III - Image 3
Remaining Works of Sohar Sewerage Network Phase III - Image 4
Remaining Works of Sohar Sewerage Network Phase III - Image 5
Remaining Works of Sohar Sewerage Network Phase III - Image 6