Reinforcement of Al Dhakliyah water transmission system Phase II
Client:NAMA
Main Contractor: Larsen and Toubro LLC
Activity:Wadi Protection for Underground pipeline
This project focuses on implementing a specialized gabion protection system designed to safeguard an essential water transmission pipeline where it crosses or runs adjacent to an active wadi (seasonal riverbed). The primary goal is to provide a robust, flexible, and erosion-resistant barrier that shields the pipeline from the extreme hydraulic forces, bed scour, and potential debris impact during flash floods


